2026-10-04
Neural sharpening jobs run amid failures
Multiple neural sharpening tasks ran on A100 and H100 systems, with some ending in failure.
What ran
- A sharpening benchmark fetched data using a transfer node with 1 CPU core, running for 24 h 21 min.
- Red 4x sharpening, pack swinir l 1 d 4 ran on a node with 256 CPU cores and 4 NVIDIA H100 graphics processors, completing in 7 h 26 min.
- Red 4x sharpening saved results via a transfer node with 2 CPU cores, lasting 4 h 46 min.
- Guided sharpening executed 24 runs on a node with 128 CPU cores and 4 NVIDIA A100 graphics processors (40 GB each), finishing in 1 h 49 min.
- Red 4x sharpening, 5 runs continued on a 64 CPU core node for 11 h 50 min.
What finished
None of the jobs marked as finished completed on this day. The records show no jobs in a completed state by end of day.
Numbers
- 9 jobs ran during the day.
- 0 jobs finished.
- 4 jobs failed.
- Jobs that ended consumed 3.86 node-hours and 988.82 core-hours.
- 3 status checks were performed, all successful.
- Three models under red 4x sharpening (edsr-l1-d4, rcan-l1-d4, rcan-l2-d4) completed training by step 375,000 and scored 0.64, 0.67, and 0.73 dB over bicubic respectively.
- SwinIR models reached step 290,000 with scores of 0.67 and 0.74 dB over bicubic.
Failures and fixes
- Red 4x sharpening, pack swinir l 1 d 4 failed twice on a 256 CPU core, 600 GB memory node, each time ending within a minute with exit code 1.
- Red 4x sharpening, scoring failed after 5 minutes on the same node type with exit code 1.
- Red 4x sharpening, 5 runs failed after 15 h 20 min on the same node with exit code 1.
The records do not say why these jobs failed. The records list no fixes.
What was learned
- edsr-l1-d4 completed with a held-out score of +0.64 dB over bicubic and final training loss of 0.012202.
- rcan-l1-d4 completed with +0.67 dB over bicubic and loss of 0.010798.
- rcan-l2-d4 completed with +0.73 dB over bicubic and loss of 0.000472.
- swinir-l1-d4 reached step 290,000 with a best score of 0.677 dB at step 230,000.
- swinir-l2-d4 reached the same step with a best score of 0.744 dB at step 290,000.
- Multiple historical performance points were recorded for rcan and swinir models across training steps.
What was decided
- Red 4x notebook: decision, exam days scored on the cluster.
- Sharpening benchmark: Notebook: benchmark first tiles timed and the 880 submitted; radar pilot timing result.
- The red 4x sharpening package file list was updated.
- The red 4x sharpening package notes were updated.
- The satellite radar global pilot package file list was updated.
- The satellite radar global pilot package notes were updated.
- The training status monitor package notes were updated.
What is next
- guided sharpening: score the six returned runs against Sentinel-2 on terrain-placed scenes once the independent-truth collection closes, about 10 October
- red 4x sharpening: runs 1 to 5 are training on H100 nodes (about 15 hours for the longest); then choose the best network and loss; runs 6 and 7 follow
- true color v3: a new plan for a day and low-sun hybrid before any further training; the standard recipe stays on the site
- satellite radar global pilot: the four 72-hour training runs wait for a free A100 node (timing says 8 to 9 hours each); scoring on the cluster follows; the Europe test waits for 90 days of radar, about 17 December
- sharpening benchmark: the remaining 880 tiles are being fetched and built (about 110 processor-hours), then scored and released
- coincidence framework: build the one-year census package, about 4 node-hours on CPU nodes
- waiting in the queue: sharpening benchmark, building (allowed 14 h)
- waiting in the queue: sharpening benchmark, scoring (allowed 3 h)
- waiting in the queue: sharpening benchmark, release (allowed 4 h)
Narrative written by the house model from the day's records and checked by code; decisions and next steps copied from the records. Back to the study page.