All runs finished, 54.09 node-hours used
Dynamic compositional representations · October 5, 2026
All 1046 runs across 12 grids finished. The study used 54.09 node-hours and is now complete.
What ran
The following grids ran to completion: grid1, grid1b, ctx1, ctx2, fold1c, ctx3, ctx3-transplant, grid2-role, fold1, fold1b, fold1c-lm, ctx3-lm.
What finished
All 1046 runs finished. No runs are running or waiting to start. The last jobs to finish were the timing tests and the final chunks of the grid2-role, fold1, fold1c-lm, and ctx3-lm grids.
The numbers
- Total runs: 1046
- Finished runs: 1046
- Running runs: 0
- Failed runs: 0
- node-hours used so far: 54.09
- core-hours used so far: 578.1 (grid1), 322.3 (grid1b), 243.3 (ctx1), 280.8 (ctx2), 508.3 (fold1c), 329.7 (ctx3), 216.2 (ctx3-transplant), 3770 (grid2-role), 2505.7 (fold1), 1235.4 (fold1b), 725.6 (fold1c-lm), 653.7 (ctx3-lm)
Failures and what was done
There were no run failures. Five jobs stopped early due to time limits but completed their work in subsequent chunks. No action was needed.
What was learned
A notebook entry confirmed that grid2-role used 14.73 node-hours (3,770 core-hours), correcting an earlier projection. Another finding confirmed that R4 fails under both the original and corrected readings, supporting the negative result. The fold line closed as negative: R1, R2, and R4 all fail under corrected readings, and R3 is not readable. A design review found six issues requiring fixes before publication, including statistical corrections and larger seed counts for key claims.
What was decided
The study team decided to close the first line (grid1, grid1b, ctx1) as negative, with no condition beating the table baseline under corrected tests. They decided to apply a shared statistics module with proper minimum-effect screening and Holm correction for all results. They also decided to require 15–20 seeds for any claim-bearing cell and to report context-swap and rebinding results as untested until further work.
What is next
The next steps are:
- the angles line, ctx3 reads (job 3478456) is waiting: waiting for its turn
- the context line, ctx1 reads (job 3478459) is waiting: waiting for its turn
- the context line, ctx2 reads (job 3478463) is waiting: waiting for its turn
- the multiplication line, fold1c reads (job 3478466) is waiting: waiting for its turn
Additionally, the team will carry out post-hoc reading passes per grid and update public pages with final results and methods.